Along the corner and along the seam (3x rivet) to the "counter". Smooth counter plate under the overhanging corner (nt) and through it to the platform. (Variant 4: in the right part of the "counter" with the edge to the platform). Vertical wall (bh) upwards and to the right between the top lugs to the top.