In the right part of the wall, from the bottom along the edge, at the last progression bolt directly up the wall. A harder direct line formed due to the detachment of the starting block.
!! note: sometime around March/April 2020, a large piece of the wall behind Stomatologická hrana crumbled, the stability of the edge is awaiting confirmation.