Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec

Overview

Grade: 8-

Length: 25m

Wall below the slab, below the main overhang. Slab from the left below the overhang. Overhang to the belay station.

Reviews (0)

? out of 5.0
?
Add Review