Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec

Overview

Grade: 4

The start (N) is from where the rocks extend deepest into the forest. Via several possible routes over rock steps to a sloping and wide ledge under the pillar. Along it, easily into the corner. An overhanging start (N) leads into the corner itself and up it to directly below the overhang. Bypass the overhang on the right and briefly around a tree to the top.

Rules

The permit applies to sport climbing. It does not apply to bouldering, drytooling, slackline and highline.
- access only via hiking trails or marked access paths - a detailed description of the paths is in a measure of general nature
- report bird nesting to the rock manager
- climbing only in daylight
- prohibition of damaging and changing the surface of rocks
- prohibition of using protection that damages the rock
- prohibition of using winter climbing equipment
- prohibition of rappelling using trees and bushes, prohibition of interfering with vegetation and loosening stones
- prohibition of first ascents without the consent of the rock manager, who will negotiate consent with the nature protection body

OVK:
- prohibition of creating routes from above without prior OVK consent
- prohibition of using rocks and summit books for commercial purposes; any intention must be consulted with the manager and OVK

Nature conservation: Seasonal climbing ban from February 1 to June 30. Nature conservation document: NPR Bořeň - OOP 2021-2030, authority OP CHKO České středohoří (Czech Central Highlands)

The permit applies to sport climbing. It does not apply to bouldering, drytooling, slackline and highline.
- access only via hiking trails or marked access paths - a detailed description of the paths is in a measure of general nature
- report bird nesting to the rock manager
- climbing only in daylight
- prohibition of damaging and changing the surface of rocks
- prohibition of using protection that damages the rock
- prohibition of using winter climbing equipment
- prohibition of rappelling using trees and bushes, prohibition of interfering with vegetation and loosening stones
- prohibition of first ascents without the consent of the rock manager, who will negotiate consent with the nature protection body

OVK:
- prohibition of creating routes from above without prior OVK consent
- prohibition of using rocks and summit books for commercial purposes; any intention must be consulted with the manager and OVK

Nature protection: seasonal climbing ban from February 1st to June 30th. Nature Protection Document: NPR Bořeň - OOP 2021-2030, OP CHKO České středohoří authority.

Reviews (0)

? out of 5.0
?
Add Review